{"id":1471,"date":"2021-04-09T10:31:19","date_gmt":"2021-04-09T20:31:19","guid":{"rendered":"https:\/\/westoahu.hawaii.edu\/planningfacilities\/?page_id=1471"},"modified":"2022-11-28T16:03:01","modified_gmt":"2022-11-29T02:03:01","slug":"past-projects","status":"publish","type":"page","link":"https:\/\/westoahu.hawaii.edu\/planningfacilities\/past-projects\/","title":{"rendered":"Past Projects"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"1471\" class=\"elementor elementor-1471\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-e17a461 _col-1 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"e17a461\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2eb77c6c\" data-id=\"2eb77c6c\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-32889345 elementor-widget elementor-widget-heading\" data-id=\"32889345\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t<h1 class=\"elementor-heading-title elementor-size-default\">Past Projects<\/h1>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5dcf6133 elementor-widget elementor-widget-heading\" data-id=\"5dcf6133\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Maintenance Building Renovation\n<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-18da4b93 elementor-widget elementor-widget-text-editor\" data-id=\"18da4b93\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><strong>Project Description<\/strong>: The Maintenance Building has been expanded and renovations made to enhance the existing first floor Server Room, and incorporation of needed improvements at the Warehouse area, including safety fencing at electrical service panels.<br \/>The second floor has been expanded to accommodate additional office and support spaces. Renovation of existing spaces incorporates reconfigured inventory storage areas, and an Employee Training Room.<\/p><p><strong>Contractor: <\/strong>Ralph S. Inouye Co., Ltd.<strong><br \/><\/strong><\/p><p><strong>Status<\/strong>: Completed December 2021<\/p><p><strong>Cost<\/strong>: $2,484,000.00<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ba4d104 elementor-widget elementor-widget-image-gallery\" data-id=\"ba4d104\" data-element_type=\"widget\" data-widget_type=\"image-gallery.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-image-gallery\">\n\t\t\t<div id='gallery-1' class='gallery galleryid-1471 gallery-columns-3 gallery-size-full'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"ba4d104\" data-elementor-lightbox-title=\"Maintenance-Building-Rennovation-3\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTc1MSwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcL01haW50ZW5hbmNlLUJ1aWxkaW5nLVJlbm5vdmF0aW9uLTMuanBnIiwic2xpZGVzaG93IjoiYmE0ZDEwNCJ9\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-3.jpg'><img fetchpriority=\"high\" decoding=\"async\" width=\"1800\" height=\"1216\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-3.jpg\" class=\"attachment-full size-full\" alt=\"Renovated office space.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-3.jpg 1800w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-3-300x203.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-3-1024x692.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-3-768x519.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-3-1536x1038.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-3-1568x1059.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"ba4d104\" data-elementor-lightbox-title=\"Maintenance-Building-Rennovation-1\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTc0OSwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcL01haW50ZW5hbmNlLUJ1aWxkaW5nLVJlbm5vdmF0aW9uLTEuanBnIiwic2xpZGVzaG93IjoiYmE0ZDEwNCJ9\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-1.jpg'><img decoding=\"async\" width=\"1800\" height=\"1216\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-1.jpg\" class=\"attachment-full size-full\" alt=\"Training room with lockers.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-1.jpg 1800w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-1-300x203.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-1-1024x692.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-1-768x519.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-1-1536x1038.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-1-1568x1059.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"ba4d104\" data-elementor-lightbox-title=\"Maintenance-Building-Rennovation-2\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTc1MCwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcL01haW50ZW5hbmNlLUJ1aWxkaW5nLVJlbm5vdmF0aW9uLTIuanBnIiwic2xpZGVzaG93IjoiYmE0ZDEwNCJ9\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-2.jpg'><img decoding=\"async\" width=\"1800\" height=\"1216\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-2.jpg\" class=\"attachment-full size-full\" alt=\"Electric control panel enclosed behind a security fence.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-2.jpg 1800w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-2-300x203.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-2-1024x692.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-2-768x519.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-2-1536x1038.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Maintenance-Building-Rennovation-2-1568x1059.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f24b113 elementor-widget elementor-widget-heading\" data-id=\"f24b113\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Piko Outdoor Learning Space\n<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-da2341b elementor-widget elementor-widget-text-editor\" data-id=\"da2341b\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><strong>Project Description<\/strong>: The Campus Center Plaza has been enhanced with a flexible multipurpose performance and event area to accommodate orientations, career fairs, music, dance, and speaking events . A new shade structure (approximately 1,872 square feet) incorporates supporting infrastructure (power, telecommunications, WiFi, AV, theatrical lighting, etc.) to dualy serve shading and performance needs with furniture for seating and collaborative gathering. The existing planters have been modified to incorporate bench seating and convenience electrical outlets, and enhanced with new lei-friendly plantings.<\/p><p><strong>General Contractor: <\/strong>Diede Construction, Inc.<strong><br \/><\/strong><\/p><p><strong>Status<\/strong>: Completed September 2021<\/p><p><strong>Cost<\/strong>: $1,661,500.00<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c9ecae2 elementor-widget elementor-widget-image-gallery\" data-id=\"c9ecae2\" data-element_type=\"widget\" data-widget_type=\"image-gallery.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-image-gallery\">\n\t\t\t<div id='gallery-2' class='gallery galleryid-1471 gallery-columns-3 gallery-size-full'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"c9ecae2\" data-elementor-lightbox-title=\"Outdoor-Learning-Space1\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTc0NCwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcL091dGRvb3ItTGVhcm5pbmctU3BhY2UxLmpwZyIsInNsaWRlc2hvdyI6ImM5ZWNhZTIifQ%3D%3D\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1216\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space1.jpg\" class=\"attachment-full size-full\" alt=\"Several tables and chairs setup in the Outdoor Learning Space\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space1.jpg 1800w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space1-300x203.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space1-1024x692.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space1-768x519.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space1-1536x1038.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space1-1568x1059.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"c9ecae2\" data-elementor-lightbox-title=\"Outdoor-Learning-Space2\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTc0NSwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcL091dGRvb3ItTGVhcm5pbmctU3BhY2UyLmpwZyIsInNsaWRlc2hvdyI6ImM5ZWNhZTIifQ%3D%3D\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space2.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1216\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space2.jpg\" class=\"attachment-full size-full\" alt=\"A table and bench in the Outdoor Learning Space.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space2.jpg 1800w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space2-300x203.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space2-1024x692.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space2-768x519.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space2-1536x1038.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space2-1568x1059.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"c9ecae2\" data-elementor-lightbox-title=\"Outdoor-Learning-Space3\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTc0NiwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcL091dGRvb3ItTGVhcm5pbmctU3BhY2UzLmpwZyIsInNsaWRlc2hvdyI6ImM5ZWNhZTIifQ%3D%3D\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1216\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space3.jpg\" class=\"attachment-full size-full\" alt=\"Compass on the ground in the Outdoor Learning Space.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space3.jpg 1800w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space3-300x203.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space3-1024x692.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space3-768x519.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space3-1536x1038.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Outdoor-Learning-Space3-1568x1059.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9da366d elementor-widget elementor-widget-heading\" data-id=\"9da366d\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Creative Media Facility<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-69e6458 elementor-widget elementor-widget-text-editor\" data-id=\"69e6458\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><strong>Project Description<\/strong>: The 2-story state of the art educational facility (40,000 square feet) features an impressive 100-seat Screening Theater, Sound Stage, Media and Sound Editing Rooms, Instructional Classrooms, Emerging Media Suite, Faculty Offices and Outdoor landscaped screening and seating areas.\u00a0 The open Lobby features a central seating riser, media wall, caf\u00e9 and collaboration spaces.<\/p><p>The design was based on a human-centered, experiential learning approach that creates a seamless and integrated multidisciplinary environment for the students, faculty, staff, and visitors. The concept of mo\u2018olelo (storytelling) influenced the design, enabling the Creative Media Facility to be a teaching and learning environment that embodies cinema and new media.<\/p><p>The structure was designed to complement the character the campus, incorporating Concrete Masonry Unit block, standing seam metal roofing, and cement plaster. A 100 KW rooftop photovoltaic system was incorporated. \u00a0This project was delivered utilizing the Design-Build methodology.<\/p><p><strong>Design-Build Team<\/strong>:\u00a0 Gensler Architects \/ Next Design \/ Kiewit Building Group<\/p><p><strong>Status<\/strong>: Completed March 2021<\/p><p><strong>Cost<\/strong>: $36,054,500.00<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c43dfe6 gallery-mb-0 elementor-widget elementor-widget-image-gallery\" data-id=\"c43dfe6\" data-element_type=\"widget\" data-widget_type=\"image-gallery.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-image-gallery\">\n\t\t\t<div id='gallery-3' class='gallery galleryid-1471 gallery-columns-3 gallery-size-full'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"c43dfe6\" data-elementor-lightbox-title=\"UHWO-ACM-Makai-Exterior-View\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTU2MywidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDVcL1VIV08tQUNNLU1ha2FpLUV4dGVyaW9yLVZpZXctMS5qcGciLCJzbGlkZXNob3ciOiJjNDNkZmU2In0%3D\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Exterior-View-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"979\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Exterior-View-1.jpg\" class=\"attachment-full size-full\" alt=\"ACM building&#039;s makai exterior view.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Exterior-View-1.jpg 1600w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Exterior-View-1-300x184.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Exterior-View-1-1024x627.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Exterior-View-1-768x470.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Exterior-View-1-1536x940.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Exterior-View-1-1568x959.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"c43dfe6\" data-elementor-lightbox-title=\"UHWO-ACM-Makai-Entry-Plaza\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTU2MiwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDVcL1VIV08tQUNNLU1ha2FpLUVudHJ5LVBsYXphLTEuanBnIiwic2xpZGVzaG93IjoiYzQzZGZlNiJ9\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Entry-Plaza-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"979\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Entry-Plaza-1.jpg\" class=\"attachment-full size-full\" alt=\"ACM building&#039;s makai entry plaza.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Entry-Plaza-1.jpg 1600w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Entry-Plaza-1-300x184.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Entry-Plaza-1-1024x627.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Entry-Plaza-1-768x470.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Entry-Plaza-1-1536x940.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Makai-Entry-Plaza-1-1568x959.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"c43dfe6\" data-elementor-lightbox-title=\"50909171478_148f0c0bda_1o\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTc5OCwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcLzUwOTA5MTcxNDc4XzE0OGYwYzBiZGFfMW8uanBnIiwic2xpZGVzaG93IjoiYzQzZGZlNiJ9\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/50909171478_148f0c0bda_1o.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"979\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/50909171478_148f0c0bda_1o.jpg\" class=\"attachment-full size-full\" alt=\"ACM building&#039;s lobby.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/50909171478_148f0c0bda_1o.jpg 1600w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/50909171478_148f0c0bda_1o-300x184.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/50909171478_148f0c0bda_1o-1024x627.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/50909171478_148f0c0bda_1o-768x470.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/50909171478_148f0c0bda_1o-1536x940.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/50909171478_148f0c0bda_1o-1568x959.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"c43dfe6\" data-elementor-lightbox-title=\"UHWO-ACM-E-Sports\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTU2MCwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDVcL1VIV08tQUNNLUUtU3BvcnRzLTEuanBnIiwic2xpZGVzaG93IjoiYzQzZGZlNiJ9\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-E-Sports-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"979\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-E-Sports-1.jpg\" class=\"attachment-full size-full\" alt=\"ACM building&#039;s E-Sports room.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-E-Sports-1.jpg 1600w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-E-Sports-1-300x184.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-E-Sports-1-1024x627.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-E-Sports-1-768x470.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-E-Sports-1-1536x940.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-E-Sports-1-1568x959.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"c43dfe6\" data-elementor-lightbox-title=\"UHWO-ACM-Screening-Theater\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTU2NCwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDVcL1VIV08tQUNNLVNjcmVlbmluZy1UaGVhdGVyLTEuanBnIiwic2xpZGVzaG93IjoiYzQzZGZlNiJ9\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Screening-Theater-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"979\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Screening-Theater-1.jpg\" class=\"attachment-full size-full\" alt=\"ACM building&#039;s screening theater room.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Screening-Theater-1.jpg 1600w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Screening-Theater-1-300x184.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Screening-Theater-1-1024x627.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Screening-Theater-1-768x470.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Screening-Theater-1-1536x940.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Screening-Theater-1-1568x959.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"c43dfe6\" data-elementor-lightbox-title=\"UHWO-ACM-Foley-Room\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTU2MSwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDVcL1VIV08tQUNNLUZvbGV5LVJvb20tMS5qcGciLCJzbGlkZXNob3ciOiJjNDNkZmU2In0%3D\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Foley-Room-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"979\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Foley-Room-1.jpg\" class=\"attachment-full size-full\" alt=\"ACM building&#039;s foley room.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Foley-Room-1.jpg 1600w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Foley-Room-1-300x184.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Foley-Room-1-1024x627.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Foley-Room-1-768x470.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Foley-Room-1-1536x940.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/UHWO-ACM-Foley-Room-1-1568x959.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bf67293 elementor-widget elementor-widget-text-editor\" data-id=\"bf67293\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p style=\"text-align: right;\"><em>\u00a9 Gensler \/ Ryan Gobuty<\/em><\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-99183db elementor-widget elementor-widget-heading\" data-id=\"99183db\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Administration and Allied Health Facility (Administration and Health Science Building)<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2df7399 elementor-widget elementor-widget-text-editor\" data-id=\"2df7399\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><strong>Project Description<\/strong>: The 2-story landmark building is comprised of 2 wings: Administration and Health Sciences (43,848 square feet). Administration spaces incorporates private and open office areas, various sized conference rooms and support spaces. The instructional wing contains Anatomy, Biology and Microbiology labs with 2 lab support rooms. There are 10 classrooms and a computer lab. A lower level classroom has infrastructure for future conversion into an Organic Chemistry lab. The faculty suites house a mix of private offices and shared workstations.<br \/>Special features include a grey water collection system, solar hot water heating to supplement the AC system, beveled face exterior concrete masonry units, and a 100KW rooftop photovoltaic system. <\/p><p><strong>General Contractor<\/strong>:\u00a0 Swinerton Builders, Inc.<\/p><p><strong>Status<\/strong>: Completed November 2018<\/p><p><strong>Cost<\/strong>: $32,700,000.00<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e92050c elementor-widget elementor-widget-image-gallery\" data-id=\"e92050c\" data-element_type=\"widget\" data-widget_type=\"image-gallery.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-image-gallery\">\n\t\t\t<div id='gallery-4' class='gallery galleryid-1471 gallery-columns-3 gallery-size-full'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"e92050c\" data-elementor-lightbox-title=\"aahf1\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTczNywidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcL2FhaGYxLmpwZyIsInNsaWRlc2hvdyI6ImU5MjA1MGMifQ%3D%3D\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1216\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf1.jpg\" class=\"attachment-full size-full\" alt=\"Outdoor seating, overlooking the Great Lawn in the Administration and Allied Health Facility building.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf1.jpg 1800w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf1-300x203.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf1-1024x692.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf1-768x519.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf1-1536x1038.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf1-1568x1059.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"e92050c\" data-elementor-lightbox-title=\"aahf3\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTc1MiwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcL2FhaGYzLmpwZyIsInNsaWRlc2hvdyI6ImU5MjA1MGMifQ%3D%3D\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1216\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3.jpg\" class=\"attachment-full size-full\" alt=\"Front entrance to the Administration and Allied Health Facility building.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3.jpg 1800w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-300x203.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-1024x692.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-768x519.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-1536x1038.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-1568x1059.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"e92050c\" data-elementor-lightbox-title=\"aahf3\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTc3OSwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcL2FhaGYzLTEuanBnIiwic2xpZGVzaG93IjoiZTkyMDUwYyJ9\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1216\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-1.jpg\" class=\"attachment-full size-full\" alt=\"Huge wall poster in the Administration and Allied Health Facility lobby.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-1.jpg 1800w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-1-300x203.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-1-1024x692.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-1-768x519.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-1-1536x1038.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/aahf3-1-1568x1059.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7729902 elementor-widget elementor-widget-heading\" data-id=\"7729902\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Wellness and Well Being (Na\u2019ulu) Center <\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2a50b5a elementor-widget elementor-widget-text-editor\" data-id=\"2a50b5a\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><strong>Project Description<\/strong>: The interior renovating\/retrofitting of vacant interior spaces located on the Ground Floor of the Campus Center Building (approximately 4,800 square feet) provided new student-focused spaces. The vacant Caf\u00e9 space was renovated to contain the Culinary Lab and Student Lounge area. The vacant Bookstore space was renovated to contain a Multi-Purpose Room, Fitness Room, and support spaces for the PIKO Program.<\/p><p><strong>General Contractor<\/strong>:\u00a0 Elite Pacific Construction, Inc.<\/p><p><strong>Status<\/strong>: Completed July 2018<\/p><p><strong>Cost<\/strong>: $2,159,621.00<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7921cba elementor-widget elementor-widget-image-gallery\" data-id=\"7921cba\" data-element_type=\"widget\" data-widget_type=\"image-gallery.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-image-gallery\">\n\t\t\t<div id='gallery-5' class='gallery galleryid-1471 gallery-columns-3 gallery-size-full'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"7921cba\" data-elementor-lightbox-title=\"Naulu-Center-2\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTc3MywidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcL05hdWx1LUNlbnRlci0yLmpwZyIsInNsaWRlc2hvdyI6Ijc5MjFjYmEifQ%3D%3D\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-2.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1216\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-2.jpg\" class=\"attachment-full size-full\" alt=\"Study area of the Naulu Center\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-2.jpg 1800w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-2-300x203.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-2-1024x692.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-2-768x519.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-2-1536x1038.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-2-1568x1059.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"7921cba\" data-elementor-lightbox-title=\"Naulu-Center-1\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTc3NCwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcL05hdWx1LUNlbnRlci0xLmpwZyIsInNsaWRlc2hvdyI6Ijc5MjFjYmEifQ%3D%3D\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1216\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-1.jpg\" class=\"attachment-full size-full\" alt=\"Naulu Center lobby\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-1.jpg 1800w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-1-300x203.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-1-1024x692.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-1-768x519.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-1-1536x1038.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-1-1568x1059.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"7921cba\" data-elementor-lightbox-title=\"Naulu-Center-3\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTc3NSwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDZcL05hdWx1LUNlbnRlci0zLmpwZyIsInNsaWRlc2hvdyI6Ijc5MjFjYmEifQ%3D%3D\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1216\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-3.jpg\" class=\"attachment-full size-full\" alt=\"Naulu Center conference room\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-3.jpg 1800w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-3-300x203.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-3-1024x692.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-3-768x519.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-3-1536x1038.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/06\/Naulu-Center-3-1568x1059.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fc90c78 elementor-widget elementor-widget-heading\" data-id=\"fc90c78\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Nursing Simulation Laboratory<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d79a0bf elementor-widget elementor-widget-text-editor\" data-id=\"d79a0bf\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><strong>Project Description<\/strong>: The interior renovation of spaces E239-E242 (988 square feet) provided improved classroom space for 20 nursing students, with distance learning components, 3 practical training beds, and an interactive simulation bed and model, and completion of the control \/ observation room, office and storage space.<\/p><p><strong>General Contractor<\/strong>:\u00a0 Kokea Construction, Inc.<\/p><p><strong>Status<\/strong>:\u00a0 Completed June 2017<\/p><p><strong>Cost<\/strong>:\u00a0 $227,271.00<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3b9b758 elementor-widget elementor-widget-image-gallery\" data-id=\"3b9b758\" data-element_type=\"widget\" data-widget_type=\"image-gallery.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-image-gallery\">\n\t\t\t<div id='gallery-6' class='gallery galleryid-1471 gallery-columns-3 gallery-size-full'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"3b9b758\" data-elementor-lightbox-title=\"NSL---Classroom\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTU0MywidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDVcL05TTC1DbGFzc3Jvb20uanBnIiwic2xpZGVzaG93IjoiM2I5Yjc1OCJ9\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Classroom.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1000\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Classroom.jpg\" class=\"attachment-full size-full\" alt=\"A classroom from the Nursing Simulation Lab\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Classroom.jpg 1600w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Classroom-300x188.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Classroom-1024x640.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Classroom-768x480.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Classroom-1536x960.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Classroom-1568x980.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"3b9b758\" data-elementor-lightbox-title=\"NSL---Simulation-Lab\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTU0NCwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDVcL05TTC1TaW11bGF0aW9uLUxhYi5qcGciLCJzbGlkZXNob3ciOiIzYjliNzU4In0%3D\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Simulation-Lab.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1000\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Simulation-Lab.jpg\" class=\"attachment-full size-full\" alt=\"The simulation lab, viewed from outside the viewing window.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Simulation-Lab.jpg 1600w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Simulation-Lab-300x188.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Simulation-Lab-1024x640.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Simulation-Lab-768x480.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Simulation-Lab-1536x960.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Simulation-Lab-1568x980.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"3b9b758\" data-elementor-lightbox-title=\"NSL---Patient-Room\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTU0NSwidXJsIjoiaHR0cHM6XC9cL3dlc3RvYWh1Lmhhd2FpaS5lZHVcL3BsYW5uaW5nZmFjaWxpdGllc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyMVwvMDVcL05TTC1QYXRpZW50LVJvb20uanBnIiwic2xpZGVzaG93IjoiM2I5Yjc1OCJ9\" href='https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Patient-Room.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1000\" src=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Patient-Room.jpg\" class=\"attachment-full size-full\" alt=\"A patient room from the Nursing Simulation Lab.\" srcset=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Patient-Room.jpg 1600w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Patient-Room-300x188.jpg 300w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Patient-Room-1024x640.jpg 1024w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Patient-Room-768x480.jpg 768w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Patient-Room-1536x960.jpg 1536w, https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-content\/uploads\/2021\/05\/NSL-Patient-Room-1568x980.jpg 1568w\" sizes=\"(max-width: 34.9rem) calc(100vw - 2rem), (max-width: 53rem) calc(8 * (100vw \/ 12)), (min-width: 53rem) calc(6 * (100vw \/ 12)), 100vw\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-acd5372 elementor-widget elementor-widget-heading\" data-id=\"acd5372\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Library Flood Mitigation<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-865c467 elementor-widget elementor-widget-text-editor\" data-id=\"865c467\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><strong>Project Description<\/strong>: To address an ongoing flooding problem at the Library building entry area that would occur during heavy rain events, sitework improvements incorporated new integrated trench drains, concrete slab to slope water away from the building, and drainage swale in the Great Lawn to direct storm water runoff into a new rip-rapped drainage catch basin leading to Kaloi Gulch.<\/p><p><strong>General Contractor<\/strong>:\u00a0Construction Engineers, LLC<\/p><p><strong>Status<\/strong>: Completed May 2016<\/p><p><strong>Cost<\/strong>: $249,222.00<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Past Projects Maintenance Building Renovation Project Description: The Maintenance Building has been expanded and renovations made to enhance the existing first floor Server Room, and incorporation of needed improvements at the Warehouse area, including safety fencing at electrical service panels.The second floor has been expanded to accommodate additional office and support spaces. Renovation of existing &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/westoahu.hawaii.edu\/planningfacilities\/past-projects\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Past Projects&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"_mi_skip_tracking":false,"footnotes":""},"class_list":["post-1471","page","type-page","status-publish","hentry","entry"],"_links":{"self":[{"href":"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-json\/wp\/v2\/pages\/1471","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-json\/wp\/v2\/comments?post=1471"}],"version-history":[{"count":82,"href":"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-json\/wp\/v2\/pages\/1471\/revisions"}],"predecessor-version":[{"id":1954,"href":"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-json\/wp\/v2\/pages\/1471\/revisions\/1954"}],"wp:attachment":[{"href":"https:\/\/westoahu.hawaii.edu\/planningfacilities\/wp-json\/wp\/v2\/media?parent=1471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}